Ad blocking detected, consider supporting www.OpenSubtitles.org in an other way
X
Advanced search
Watch movies with subtitles using Open Subtitles MKV Player. It is free and clean, works under Windows.

Subtitles from trusted sourceSubtitles for high-definition movie

"Studio 60 on the Sunset Strip" The Long Lead Story S01E05 English subtitles (2006) 1CD srt

Season: 1 - Episode: 5

- All subtitles for this TV Series
film

Buy at Amazon

Subtitle details

Download
Thanks1 thanks received


Add subtitles to your movies with Freemake Video Converter

Subtitle filenameStudio.60.on.the.Sunset.Strip.S01E05.HDTV.XviD-MiNT.srt (68944bytes) show preview

Uploader commentStudio 60 on the Sunset Trip - 1x05 - The Long Lead Story
Release nameStudio.60.on.the.Sunset.Strip.S01E05.HDTV.XviD-MiNT23.980 FPS
UploaderWorst @ . downloaded4076x () . Vote for subtitles10.0 / 10 (2votes) . Remove from favouritesAdd to favourites . Correct subtitlesCorrect subtitles

Uploaded from BSPlayer v2.57 developed by bst2

Comment

log-in to post comments.

Studio 60 on the Sunset Strip subtitles English S01E05
Release name#CD UploadedDownloadedSubtitle ratingUploader
A.szinfalak.mogott.S01E05.WS.DVDRip.Dual.XviD-VR-DVD1CD145x 0.00
Studio 60 on the Sunset Strip1CD930x 10.00
Interesting links
All subtitles for this movie in this languageAll subtitles for this movie
All subtitles from this userRequest this subtitle for a different release
About movie:About movie @ http://www.imdb.comFind file:Studio 60 on the Sunset Strip downloadDownload warez
Release:Release @ http://www.btarena.orgRelease @ http://nfo.raidrush.wsTrailers:Trailers @ http://www.imdb.com
Posters:Posters @ http://www.imdb.comCovers:Covers @ http://www.allcdcovers.comCovers @ http://www.cdcovers.ccCovers @ http://www.cdcovers.to
Others:Your link here
Movie detailsMovie Rating:8.2 / 10 (251)
[ ] - A magazine writer shows up to write a story about the show, but ends up focusing her questions on the hot-and-cold relationship between Matt and Harriet.
Directed by:
Writer credits:
Language:
Hide ads
download subtitle